Verifying the shim tray at the gearbox assembly bench
A shim selected for one gearbox can reach the next bench in the right tray but end up in the wrong unit. The operator needs the warning while the shim is still in the tray.
In this illustrative BMC POWER scenario, the operator gets a warning at gearbox 043, moves tray T-17 to gearbox 042 and fits the shim after the match is confirmed.
How UWB helps
At preparation, the work order links the selected shim code, the UWB tray tag and the gearbox serial number. When the tray is set down, the assembly system compares the assigned gearbox with the one at that bench. If the two benches cannot be distinguished by position, the operator scans the housing code. Shim thickness comes from the measurement record.